It’s been almost 3 months since the last update. I’d like to say I’ve gotten a lot done, but it hasn’t turned out that way. Lots of school obligations that I didn’t entirely plan for manifested and here we are almost to November.
I have gone to work on the plane, but just nothing ground breaking to report. We did head out to the hangar yesterday though and got the horizontal stabilizers mounted and all of the tasks required to get to that point. It’s always fun to start something and be able to finish it in the same day. Getting the bolts to go through the stabilizer and fuselage bushings was an exciting activity, but just needed a loving tap from a small hammer to coerce the correct behavior. 🙂
I brought home some steel parts to get powder coated before I completely install the stabilizers since there are some tabs where the tail wheel spring mounts to. I’d like to get them to the powder coat place this week and have them ready to go for the next time I go down.
Since the last update we have also worked on the mounting brackets for both the flaps and ailerons and they are complete and ready to be installed.
We started to also fit the wingtips up and still have some work to do on that front.
The engine monitor has been neglected somewhat as well. In the beginning of the semester I acquired a few more components for it, but I need time to get some soldering done so I can start testing and integrating them. The new stuff will be a power supply/regulator so it can be hooked up to a 12V supply. In addition, there is a small battery that will provide power after the plane’s power is turned off so that the engine monitor can shutdown properly and avoid corrupting the file system.
(30 h)
Loic
good job Ryan!! you will have to buy the engine pretty soon!!
Ryan
It can’t be that much longer 🙂